Research Article

Crack Risk Evaluation of Submerged Concrete Tunnel during Hardening Phase

Table 7

Calculated temperatures and the increase of temperature.

ConcreteTemperature (°C)
Outer wallInner wallWhole structure
Tmax_outΔTmax_outTmax_middleΔTmax_middleTmax_wholeΔTmax_whole

SV4060.740.760.340.369.049.0
40% FA46.526.546.226.253.133.1
60% FA42.222.241.921.948.428.4
60% FA-11°C36.525.536.425.441.330.3
40% BFS45.625.645.225.253.833.8
60% BFS44.924.944.724.750.630.6