Crack Risk Evaluation of Submerged Concrete Tunnel during Hardening Phase

Table 8

Tensile strength at 14 days after casting.

Concreteft28 (N/mm2)Maturity time at 14 days after casting (days)Tensile strength at critical time (N/mm2)

SV403.8622.23.79
40% FA3.3220.73.19
60% FA3.0022.52.91
60% FA-11°C3.0019.72.86
40% BFS3.8920.73.74
60% BFS3.3421.03.20