Research Article
Stability Control and Quick Retaining Technology of Gob-Side Entry: A Case Study
Figure 15
Pictures of the gob-side entry retaining artificial wall construction: (a) initial placement of a block; (b) position adjustment by the hydraulic prop; (c) final position of the block; (d) connection with the roof of the entry.
(a) |
(b) |
(c) |
(d) |