Research Article

Seismic Risk Mitigation for a Portfolio of Reinforced Concrete Frame Buildings through Optimal Allocation of a Limited Budget

Figure 1

Estimation of retrofitting cost based on the risk level of two classes of buildings for “partial” and “full” retrofitting: (a) buildings constructed before 1972; (b) buildings constructed after 1972.
(a)
(b)