Research Article
Biaxial Shear Load Capacity of Anchor System for Quick-Hardening Track on Railway Bridges
Figure 2
Concept of the anchor system for a quick-hardening track: (a) placing anchor brackets, (b) laying ballast, (c) installation of rails and sleepers, (d) laying additional ballast, (e) quick-hardening mortar injection and curing, and (f) installation of postinstalled anchors.
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |