Research Article

Biaxial Shear Load Capacity of Anchor System for Quick-Hardening Track on Railway Bridges

Figure 2

Concept of the anchor system for a quick-hardening track: (a) placing anchor brackets, (b) laying ballast, (c) installation of rails and sleepers, (d) laying additional ballast, (e) quick-hardening mortar injection and curing, and (f) installation of postinstalled anchors.
(a)
(b)
(c)
(d)
(e)
(f)