Research Article
Assessment of the Dynamic Behavior of Beam-to-Column Connections in Steel Pallet Racks under Cyclic Load: Numerical Investigation
| ā | ID | Column | Column thickness (mm) | Thickness of beam-end connector (mm) | Beam depth | Beam position | Number of rivets | Clearance |
| A | A-1 | M120 | 2.5 | 4 | B80 | Upper | 3 | 1 | A-2 (standard) | M120 | 2.5 | 4 | B100 | Upper | 3 | 1 | A-3 | M120 | 2.5 | 4 | B120 | Upper | 3 | 1 | B | B-1 | M120 | 2 | 4 | B100 | Upper | 3 | 1 | B-2 (standard) | M120 | 2.5 | 4 | B100 | Upper | 3 | 1 | B-3 | M120 | 3 | 4 | B100 | Upper | 3 | 1 | C | C-1 (standard) | M120 | 2.5 | 4 | B100 | Upper | 3 | 1 | C-2 | M120 | 2.5 | 4 | B100 | Upper | 4 | 1 | D | D-1 (standard) | M120 | 2.5 | 4 | B100 | Upper | 3 | 1 | D-2 | M120 | 2.5 | 4 | B100 | Middle | 3 | 1 | D-3 | M120 | 2.5 | 4 | B100 | Lower | 3 | 1 | E | E-1 (standard) | M120 | 2.5 | 4 | B100 | Upper | 3 | 1 | E-2 | M120 | 2.5 | 5 | B100 | Upper | 3 | 1 | E-3 | M120 | 2.5 | 6 | B100 | Upper | 3 | 1 | F | F-1 (standard) | M120 | 2.5 | 4 | B100 | Upper | 3 | 1 | F-2 | M120 | 2.5 | 4 | B100 | Upper | 3 | 2 | F-3 | M120 | 2.5 | 4 | B100 | Upper | 3 | 3 |
|
|