Research Article

A Structural Calculation Model of Shield Tunnel Segment: Heterogeneous Equivalent Beam Model

Table 4

Calculation parameters of surrounding rock.

Layer name (kN·m−3) (°) (kPa)

Filled soil17.32812
Mucky soil, fine sand layer18.5186
Diluvium and alluvium layer19.5201
Intense weathering mud rock21.624200