Research Article

Determination of Period of RC Buildings by the Ambient Vibration Method

Figure 6

Comparison of period/height ratios of the buildings. (a) Set 1: without infill walls. (b) Set 1: with infill walls. (c) Set 2: before retrofit. (d) Set 2: after retrofit.
(a)
(b)
(c)
(d)