Research Article

BIM Use by Architecture, Engineering, and Construction (AEC) Industry in Educational Facility Projects

Table 9

Relationship between the role of the respondent and the perceived value of BIM in different phases of the design and construction process.

Project phasesSpecific project phasesArchitects NA = 30 nA = 160Site engineers NSE = 4 nSE = 15Structural engineers NSTE = 11 nSTE = 44MEP engineers NMEPE = 5 nMEPE = 34Contractors NC = 15 nC = 78

DesignPredesign9 (30%)0 (0%)1 (9%)3 (60%)4 (27%)
Schematic design22 (73%)2 (50%)5 (45%)4 (80%)7 (47%)
Design development23 (77%)3 (75%)8 (73%)4 (80%)10 (67%)
Construction documentation23 (77%)4 (100%)9 (82%)4 (80%)12 (80%)

ConstructionBidding process14 (47%)0 (0%)3 (27%)3 (60%)9 (60%)
Preconstruction15 (50%)2 (50%)4 (36%)4 (80%)10 (67%)
Construction administration19 (63%)2 (50%)6 (55%)3 (60%)11 (73%)
Fabrication15 (50%)1 (25%)7 (64%)4 (80%)6 (40%)
Close-out/commissioning8 (27%)0 (0%)0 (0%)2 (40%)5 (33%)

Operation and maintenanceOperation and maintenance12 (40%)1 (25%)1 (9%)3 (60%)4 (27%)

Note.Select all that apply. Percent (%) = number of selections divided by number of respondents for a specific discipline. Total N = 65 and total n = 331.