Application Study on Building Information Model (BIM) Standardization of Chinese Engineering Breakdown Structure (EBS) Coding in Life Cycle Management Processes
Table 3
Main body of road EBS coding (from the 5th to 8th district).
The 5th district
The 6th district
The 7th district
The 8th district
Structural classification
Coding
Structural component
Coding
Structural part
Coding
Structural member
Coding
Subgrade structure
A
Roadbed
A
No breakdown structure
N###
No breakdown structure
N###
Embankment
B
Subsoil
C
Soil improvement
D
Verge
B
Soil surfaced road
A
Hard shoulder
B
Side slope
C
Fill slope
A
Cut slope
B
Plain stage of slope
C
Berm
D
Lane separator
D
Plants
A
Curbstone
B
Water draining
C
Water draining system
E
Side drain
A
Water-diversion ditch
B
Cut-off ditch
C
Chute drop
D
Road embankment wall
F
Wall
A
Basement
B
Shrinkage and tension joint
C
Drain hole
D
Cut slope wall
G
Wall
A
Basement
B
Shrinkage and tension joint
C
Drain hole
D
Road shoulder wall
H
Wall
A
Basement
B
Shrinkage and tension joint
C
Drain hole
D
Both the main body of the roads and surfaces in the seventh and eighth districts are empty due to structural simplicity. In such circumstances, we should use the letter and pound sign “N###” to indicate that the EBS coding is complete.