Research Article

Predictive Analysis of Settlement Risk in Tunnel Construction: A Bow-Tie-Bayesian Network Approach

Table 3

Partial construction log of the “normal excavation speed” in the XWS.

n = 1–10n = 11–20n = 21–30n = 31–40n = 41–50n = 51–60n = 61–70n = 71–80n = 81–90n = 91–100

30.3–50.625–3227.6–42.47.8–42.525–3518–3927–4320–4130–4720–54
32.4–38.826–3423.2–47.68.3–41.728–4620–3524–4010–4030–6132–63
28.4–39.627–4223.3–44.520.2–47.617–3515–4227–4720–3520–6132–58
30.3–38.823–3620.5–42.724.2–42.528–3727–4120–3317–3230–6020–37
30.3–36.312.3–34.828.2–45.628.7–52.617–3621–3722–348–4014–5824–40
32–4417.8–32.518.2–42.619–3220–3731–4127–488–4027–7425–48
31–4219.8–37.413.7–37.522–4520–3530–4030–4220–5015–5524–51
31–3913.5–32.615.6–32.621–4421–3730–3525–4320–5025–4532–46
30–4213.4–32.620–3719–4220–3520–4028–3620–4628–5225–40
31–3815.6–36.415–4020–4120–3725–4022.5–3731–4231–4720–35