Predictive Analysis of Settlement Risk in Tunnel Construction: A Bow-Tie-Bayesian Network Approach
Table 6
Standard values and ranges of excavation speed and TBMPs.
| Factors | (mm/min) | F (kN) | P N (kPa) | M T (kN·m) | P G (kPa) |
| Parameter range | [20, 44] | [8300, 13100] | [117, 143] | [1294, 2974] | [197, 302] | Standard value | 32 | 9700 | 132.6 | 2270 | 302 | Deviation range (%) | [−37.5, 37.5] | [−14.43, 35.05] | [−11.76, 7.84] | [−43.0, 31.01] | [−34.77, 0] |
|
|