Predictive Analysis of Settlement Risk in Tunnel Construction: A Bow-Tie-Bayesian Network Approach

Table 6

Standard values and ranges of excavation speed and TBMPs.

Factors (mm/min)F (kN)P N (kPa)M T (kN·m)P G (kPa)

Parameter range[20, 44][8300, 13100][117, 143][1294, 2974][197, 302]
Standard value329700132.62270302
Deviation range (%)[−37.5, 37.5][−14.43, 35.05][−11.76, 7.84][−43.0, 31.01][−34.77, 0]