Research Article
Instability Process of Crack Propagation and Tunnel Failure Affected by Cross-Sectional Geometry of an Underground Tunnel
Figure 1
The main equipment used in the test system to monitor crack propagation and tunnel failure. (a) Key equipment. (b) Loading system. (c) The bearing system.
(a) |
(b) |
(c) |