Research Article

Instability Process of Crack Propagation and Tunnel Failure Affected by Cross-Sectional Geometry of an Underground Tunnel

Figure 1

The main equipment used in the test system to monitor crack propagation and tunnel failure. (a) Key equipment. (b) Loading system. (c) The bearing system.
(a)
(b)
(c)