Research Article

Instability Process of Crack Propagation and Tunnel Failure Affected by Cross-Sectional Geometry of an Underground Tunnel

Figure 20

Model tunnels after load-testing. (a) Tunnel T1. (b) Tunnel T2. (c) Tunnel T3. (d) Tunnel T4.
(a)
(b)
(c)
(d)