Research Article
Development of Debris Flow Impact Force Models Based on Flume Experiments for Design Criteria of Soil Erosion Control Dam
Table 3
Summary of the result of the comparison of velocity estimation models.
| | Formula | Coefficient | RMSE | CV | Reference | Notation (unit) | Value (mean ± standard error) |
| Newtonian laminar flow | | μ (kg·m−1·s−2) | 0.73 ± 0.03 | 1.32 | 0.50 | [5] | Dilatant flow | | ξ (m−1/2·s−1) | 2044.80 ± 58.08 | 1.14 | 0.29 | [5, 18] | Newtonian turbulent flow | | n (m−1/3·s) | 0.0221 ± 0.0006 | 0.62 | 0.26 | [5, 19] | Voellmy flow | | C1 (m−1/2·s−1) | 25.57 ± 0.46 | 0.56 | 0.18 | [16] | This study | | Ce (s−1) | 25.60 ± 0.31 | 0.37 | 0.12 | |
|
|
The value of each coefficient is expressed as “mean ± standard error.” RMSE is the root mean square error and CV means the coefficient of variance.
|