Research Article

Seepage Analysis of a Multilayer Waste Slope considering the Spatial and Temporal Domains of Permeability

Table 3

Variation of pore pressure at P2–P5 with time in Scheme 2 and Scheme 3.

Time t (day)Pore pressure P (kpa)
Scheme 2Scheme 3
P2P3P4P5P2P3P4P5

1−9.12−8.90−7.75−24.43−9.09−8.76−7.74−24.42
3+2.05+0.27−10.98−27.38+2.06+0.06−10.97−27.35
4−5.90−26.58−8.94−25.01−5.87−26.46−8.86−24.92
6−38.47−88.15+2.46−12.75−38.41−87.88+2.72−12.46
10−56.77−122.17+29.48+15.08−56.70−121.78+29.91+15.52
25−71.75−145.27+63.47+48.33−71.62−144.86+63.78+48.64
480−91.42−178.54+37.34+20.62−91.35−178.47+37.39+20.67