Research Article

A BIM-Based Study on the Comprehensive Benefit Analysis for Prefabricated Building Projects in China

Table 4

Results of economic merits by shortening construction period (¥/m2).

ItemCost-savingSumTotal

Capital charges (B1)Loan interest payments (B11)173.3173.3552.9
Material rental expense (B2)Formwork (B21)78.5170.2
Scaffolding (B22)91.7
Equipment rental expense (B3)Mortar pump systems (B31)43.1209.5
Suspended platforms (B32)28.9
Concrete pump systems (B33)137.5