Journals
Publish with us
Publishing partnerships
About us
Blog
Advances in Civil Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Advances in Civil Engineering
/
2019
/
Article
/
Tab 6
/
Research Article
A Multistep Method for Automatic Determination and Optimization of Microseismic P-Phase Arrival Times in a Coal Mine
Table 6
Comparison of picking methods in terms of speed and accuracy.
Number
Accuracy
Calculating speed
Remarks
Manual pick
6.6 ms (average error)
3 min
This contrast is limited to data of 12 channels
Automatic pick
0.039 s