Table 2

Identified input variables.

Input variablesReferences

Project type[12, 54]
Project complexity[7, 10]
Project location[10ā€“12, 21, 28, 33, 54, 58]
Project scope[7, 11, 12, 26, 54]
Project size[8, 11, 12, 21, 26, 54]
Site topography[12, 21, 25, 56, 59]
Bridge type[21, 23]
Number of bridges[12, 21, 23]
Existence of groundwater[12]
Soil type[12, 26, 56, 60]
Inflation rate[11, 12, 54]
Project duration[7, 10, 12, 21, 26]