Influences of Urban Viaduct Pier Caps on Uneven Settlement of Roadbed
Table 3
Transverse roadbed settlement for different levels of buried depth of cap H.
| Buried depth of cap H (m) | 0.2 | 0.85 | 1.35 | 1.85 | 2.35 | 2.85 | Level of settlement at point A (mm) | 8.1 | 8.5 | 9.0 | 10.4 | 24.5 | 25.4 | Level of settlement at point B (mm) | 82.3 | 84.2 | 84.6 | 84.0 | 91.5 | 95.7 | Settlement fall between point A and B (mm) | 74.2 | 75.7 | 75.6 | 73.6 | 67.0 | 66.3 |
|
|