Influences of Urban Viaduct Pier Caps on Uneven Settlement of Roadbed

Table 3

Transverse roadbed settlement for different levels of buried depth of cap H.

Buried depth of cap H (m)0.20.851.351.852.352.85
Level of settlement at point A (mm)8.18.59.010.424.525.4
Level of settlement at point B (mm)82.384.284.684.091.595.7
Settlement fall between point A and B (mm)74.275.775.673.667.066.3