Research Article
Application of Constant Resistance and Large Deformation Anchor Cable in Soft Rock Highway Tunnel
Figure 9
NPR anchor cable installation process. (a) Reaming operation. (b) Installing constant resistance device. (c) Mixing resin anchoring agent. (d) Applying pretension force to the anchor cable.
(a) |
(b) |
(c) |
(d) |