Research Article

Rethinking the Water Leak Incident of Tunnel LUO09 to Prepare for a Challenging Future

Figure 2

Scenario for progressing the water leak incident: (a) water leak (SF: backfill; SM = silty sand; CL: low plasticity clay), (b) illustration of the shortest path for groundwater seepage, (c) formation of the surface cave-in on the south side, and (d) formation of the surface cave-in on the north side (SF: backfill; SM = silty sand; CL: low plasticity clay).
(a)
(b)
(c)
(d)