Research Article
Influence of Small, Clear Distance Cross-Tunnel Blasting Excavation on Existing Tunnel below
Figure 5
Time-history curve of vibration velocity at Point B during blasting of Section I (a), Section II (b), Section III (c), and Section IV (d).
(a) |
(b) |
(c) |
(d) |