Research Article

Influence of Small, Clear Distance Cross-Tunnel Blasting Excavation on Existing Tunnel below

Table 1

Vibration monitoring data of Jia Hua Tunnel Left Line.

Blasting sectionsBlasting cycle footagePoint APoint BPoint C
PPV (cm/s)Peak acceleration (cm/s2)PPV (cm/s)Peak acceleration (cm/s2)PPV (cm/s)Peak acceleration (cm/s2)

Section I16.7338.435.2232.744.6230.97
Section II18.9662.848.0539.256.2135.90
Section III0.58.2567.386.5741.575.0941.36
Section IV0.59.4879.235.3871.755.2742.95