|
Risk grades | Critical | High |
|
Response plan | Mitigation response plans | Mitigation response plans |
Control combustible materials | Control combustible materials |
Remove bus stops and parking lots. | Remove bus stops and parking lots. |
Propose detours for hazardous material truck | Propose detours for hazardous material truck |
Install speed dump | Install speed dump |
Install reflector for a blind spot | Install reflector for a blind spot |
Install speed indicator | Install speed indicator |
Improve drainage system. | Improve drainage system |
Traffic control. | |
Preparedness response plans | Mitigation response plans |
Install fire surveillance equipment | Establish contingency plans linked to fire department and secure fire |
Install fireproof equipment | |
Install fire suppress equipment | |
Establish contingency plans linked to fire department and secure fire | |
Reinforce the bridge with fire resistance design/rehabilitation | |
Manual fire alarm boxes | |
|
Risk grades | Moderate | Low/very low |
|
Response plan | Mitigation response plans | Mitigation response plans |
Control combustible materials | Control combustible materials |
Remove bus stops and parking lots. | Remove bus stops and parking lots. |
Propose detours for hazardous material truck | |
Preparedness response plans | |
Establish contingency plans linked to fire department and secure fire | |
|