Research Article

Semiquantitative Fire Risk Grade Model and Response Plans on a National Highway Bridge

Table 2

Maximum surface temperature of steel bridges according to mobilization time criteria and vertical clearance (130 MW). Unit: °C.

Mobilization time criteria for fire suppression (min)Vertical clearance (m)
456789101112131415

I (0–5)209148107796048413532292826
II (5–8)32332732330228524221516915511110378
III (8–10)371396402393377337295243220165137110
IV (10–20)589658684678659595533449370284226178
V (more than 20)10011000981927871764679570480365305237