Research Article

Pounding between Adjacent Frame Structures under Earthquake Excitation Based on Transfer Matrix Method of Multibody Systems

Figure 19

Time-history diagram of J2, displacement under seismic wave (peak acceleration is 35 cm/s2). (a) 10 mm, (b) 20 mm, and (c) 30 mm.
(a)
(b)
(c)