Research Article
Pounding between Adjacent Frame Structures under Earthquake Excitation Based on Transfer Matrix Method of Multibody Systems
Figure 20
Time-history diagram of J2, displacement under seismic wave (peak acceleration is 70 cm/s2). (a) 10 mm, (b) 40 mm, and (c) 60 mm.
(a) |
(b) |
(c) |