Peak displacement of J1, under the excitation of seismic wave.

Seismic peak accelerationSeparation gapEl Centro-MS-TMM (mm)El Centro-ANSYS (mm)Error (%)Nanjing-MS-TMM (mm)TAFT-MS-TMM (mm)

35 cm/s210 mm13.2512.446.5110.7615.41
20 mm15.7114.984.8712.5117.52
30 mm17.1716.434.514.1718.39

70 cm/s210 mm26.6224.239.8624.4729.36
40 mm32.2930.755.0129.1833.29
60 mm36.4834.515.7133.7937.15

220 cm/s2100 mm94.3589.715.1796.61100.77
130 mm108.74100.847.83113.54109.13
150 mm126.73121.314.47124.49125.57

400 cm/s2100 mm179.27169.395.83189.03170.16
200 mm162.60152.36.76167.81163.25
210 mm163.71155.675.16167.81163.25