Research Article

Long-Term Deformation Analysis of Recycled Construction Waste Subgrade Filler

Table 5

Requirements of minimum CBR and maximum particle size for subgrade fillers.

Position of filler application (below the top of roadbed) (m)Minimum CBR (%)Maximum particle (mm)
Expressway and first class highwaySecond class highwayThird and fourth class highway

Fill subgradeUpper roadbed (0–0.30)865100
Lower roadbed (0.30–0.80)543100
Upper embankment (0.80–1.50)433150
Lower embankment (>1.50)322150
Cut subgrade0–0.30865100
0.30–0.80543100