Application of Artificial Neural Network(s) in Predicting Formwork Labour Productivity
Table 1
Labour productivity factors.
| ||||||||||||||||||||||||
Temperature: based on an average of eight working hours a day (°C). Humidity: average humidity of eight working hours a day in percentage form. Precipitation: includes four numerical value terms assigned as: no precipitation = 0, light rain = 1, snow = 2, and rain = 3. Wind speed: average wind speed for eight working hours a day and included in the calculation in terms of km/h. Height: related to the floor being worked on and included in terms of the number of floors. Work type: three different types of formwork installation included as slabs = 1, walls = 2, and columns = 3. Work method: covers two techniques built in place (BIP) and flying forms (FF). BIP was coded as 1 and FF was coded as 2. Gang size: number of persons in a crew. Labour percentage: the ratio of labour to gang size obtained from the following equation: (labour% = labour size/gang size) × 100. |