Research Article
A Bilevel Multiobjective Optimisation Approach for Solving the Evacuation Location Assignment Problem
Table 6
Flow on links of network when minimising construction cost of shelters.
| Link | Evacuation flow (vehicles) |
| 1 ⟶ 8 | 25451 | 2 ⟶ 1 | 18884 | 3 ⟶ 2 | 9884 | 4 ⟶ 3 | 6000 | 3 ⟶ 9 | 4550 | 5 ⟶ 11 | 7000 | 6 ⟶ 7 | 1474 | 6 ⟶ 9 | 6526 | 7 ⟶ 8 | 21550 | 9 ⟶ 7 | 11,076 | 11 ⟶ 3 | 3434 | 11 ⟶ 12 | 3566 | 12 ⟶ 1 | 3566 | 8 ⟶ 1000 | 47000 |
|
|