Research Article

Visualization of Component Status Information of Prefabricated Concrete Building Based on Building Information Modeling and Radio Frequency Identification: A Case Study in China

Table 1

Research status of integrated management of BIM-RFID technology.

ResearchersMain contributionsLimitations

Guo et al. [12]Based on BIM-RFID, a real-time location and safety warning system model for construction workers is proposedThe model is only a theoretical framework, and the warning function is not verified by examples
Gao and Pishdad-Bozorgi [13]Building equipment operation and maintenance management system based on BIM-RFID technology is establishedMost of the construction equipment information collected in this system comes from the operation and maintenance management manual, and the information processing is relatively inefficient
Chan et al. [14]The idea of combining BIM and RFID technologies for real-time data integration is put forwardThe integration of the two data is not carried out through a database terminal
Li et al. [15]The construction schedule management model of prefabricated building based on BIM-RFID technology is proposedIf a progress rework occurs, the workload of real-time dynamic adjustment is large
Altaf et al. [16]The production planning and control system of prefabricated components based on BIM-RFID technology is proposedThe system is limited to the theoretical framework, and the improvement of actual production efficiency needs to be verified
Li et al. [34]The RFID technology is used to track the construction components and improve the construction scheduleAs a data acquisition carrier, RFID has not been well used in its functions. It mainly uses BIM technology to adjust the construction schedule
Rueppel [35]An indoor emergency navigation system based on BIM-RFID is constructedThe positioning function of RFID technology is only used, which involves less information integration
Costin and Teizer [36]The integration of BIM and RFID technologies improves the accuracy of indoor positioningThere is little research on the data integration of BIM and RFID
Lee et al. [37]BIM and RFID technologies are used to manage the whole life cycle information of construction site materialsThe collection and storage of material information is not comprehensive enough and information visualization is not formed
Yun et al. [38]This study used BIM technology to simulate the construction process, which effectively improves the simulation resultsIt is only a preliminary study, and the use of RFID technology is not deep enough