Research Article

Influence of Water Inrush from Excavation Surface on the Stress and Deformation of Tunnel-Forming Structure at the Launching-Arrival Stage of Subway Shield

Figure 20

Maximum tensile and compressive stress of the segment with reinforcement depth of H = 19 m. (a) Maximum tensile stress. (b) Maximum compressive stress.
(a)
(b)