Research Article

Cost Estimation of Structural Components of a Building by considering the Seismic Load on Different Regions

Figure 3

Percentage cost of works for RC beam: (a) for Ie = 1.00; (b) for Ie = 1.25; (c) for Ie = 1.50.
(a)
(b)
(c)