Cost Estimation of Structural Components of a Building by considering the Seismic Load on Different Regions
Table 2
The total cost of RC beam.
I
e
The total cost of RC beam per zone (in thousand IDR)
10
11
12
13
14
15
16
19
1
443,667
443,667
443,667
443,667
464,722
464,722
481,573
481,573
1.25
510,117
510,117
510,605
510,605
518,676
531,758
536,158
519,698
1.5
510,117
519,413
510,605
532,039
562,936
565,603
591,096
563,636