Cost Estimation of Structural Components of a Building by considering the Seismic Load on Different Regions
Table 3
The total cost of RC column.
I
e
The total cost of RC column per zone (in thousand IDR)
10
11
12
13
14
15
16
19
1
239,491
276,536
289,161
289,161
254,387
269,389
279,471
270,473
1.25
250,988
250,988
288,688
288,688
316,290
342,176
366,501
337,077
1.5
265,990
311,191
323,701
323,701
312,122
353,899
344,943
325,327