Implementation of Process-Based and Data-Driven Models for Early Prediction of Construction Time

Table 3

Minimal, maximal, mean value, and standard deviation of input numerical variables for the BTC-GRNN model.

VariableRowsMinimumMaximumMeanStandard deviation

ln(planned costs, euro)1169.0535818.3651113.277702.06661
ln(real costs, euro)1169.0945918.5159913.358372.11371
ln(planned time, days)1162.708056.816195.070761.04090
ln(real time, days)1162.708057.509345.145281.06395