Research Article
A Framework to Assess the Seismic Resilience of Urban Hospitals
Table 3
External electric grid (E24 and E25) failure probability and repair time (days).
| ā | Pf (E24) | Repair time (median, dispersion) | Pf (E25) | Repair time (median, dispersion) |
| SLE | 0.1 | (0.5, 0.5) | 0.1 | (2, 0.5) | DBE | 0.2 | (1, 0.5) | 0.3 | (4, 0.5) | MCE | 0.3 | (2, 0.5) | 0.4 | (0.3, 4) |
|
|