K59 + 520∼K59 + 530: upward force of foamed concrete and stress calculation.

Block numberLength (m)Linear meter length (m)Height (m)Volume (m3)Foamed concrete density (kg/m3)GravityUpward arch force = buoyancy − gravity (N)Actual upward stress (MPa)Note

2.4410.51.225606832Not within the scope of immersion, excluded
②-13.4210.51.71560957554270.0016Transfer through block ②-2
②-23.42113.4256019152
2.4410.51.225606832Not within the scope of immersion, excluded