Research Article

Performance Evaluation of JPCP with Changes of Pavement Mix Design Using Pavement Management Data

Table 4

Summary of concrete pavement sections built in 2010s for performance data analysis.

Route name (#no.)IC./Jct. to IC./Jct. length (km)Construction yearLength of concrete pavement section (km/line)Data survey year

Donghae (#65)Hajodae-Yangyang (9.7)201331.72014, 2015, 2017
Suncheon Wanju (#27)Namwon-Wanju (59.5)2010204.02012, 2014, 2016
Jungbu Naeryuk (#45-1)Namyeoju-Yangpyeong (34.5)2010117.82012, 2014, 2015, 2017

Evaluation of concrete properties using in situ core specimens.