Exact Overlap Rate Analysis and the Combination with 4D BIM of Time-Cost Tradeoff Problem in Project Scheduling

Table 3

The optimized duration and resource of each activity with the combinatory method.

ā€‰123456789101112131415161718

(days)12.325.033.020.030.011.018.024.025.0252023.4241873018.915.8
3.811113.21112.411.6113.5122.3