Exact Overlap Rate Analysis and the Combination with 4D BIM of Time-Cost Tradeoff Problem in Project Scheduling
Table 4
The optimized overlap rate of each activity pair with the combinatory method.
| | 1–5 | 1–6 | 5–7 | 6–8 | 6–9 | 2–10 | 6–10 | 7–11 | 8–11 | 5–12 | 9–12 | 10–12 | 3–13 | 4–14 | 9–14 | 12–15 | 13–16 | 14–16 | 11–17 | 14–17 | 15–17 | 16–18 | 17–18 |
| | 0.01 | 0.30 | 0.02 | 0 | 0 | 0.03 | 0.80 | 0 | 0.01 | 0.01 | 0.03 | 0.30 | 0 | 0.01 | 0.01 | 0.80 | 0 | 0.01 | 0.01 | 0.02 | 0.70 | 0.03 | 0.21 |
|
|