Exact Overlap Rate Analysis and the Combination with 4D BIM of Time-Cost Tradeoff Problem in Project Scheduling

Table 4

The optimized overlap rate of each activity pair with the combinatory method.

1–51–65–76–86–92–106–107–118–115–129–1210–123–134–149–1412–1513–1614–1611–1714–1715–1716–1817–18

0.010.300.02000.030.8000.010.010.030.3000.010.010.8000.010.010.020.700.030.21