Research Article

Seismic Performance of Enclosure Wall in Postearthquake Temporary Prefabricated Light-Weight Steel Structure

Figure 15

Arrangement of the pull-on the rope displacement transducer. (a) Elevation of the wall perpendicular to the direction of vibration: (i) pull-on the rope displacement transducer and (ii) end of pull-on the rope. (b) Installation diagram for pull-on the rope displacement transducer in site.
(a)
(b)