Research Article
Design of Groundwater Extraction in Open Cut Foundation Pit and Simplified Calculation of Ground Subsidence due to Dewatering in Sandy Pebble Soil Strata
Figure 26
Group wells pore water pressure nephogram after the first drawdown (unit: Pa). (a) Cross section of the well midpoint. (b) Longitudinal section of the well midpoint.
(a) |
(b) |