Research Article

Improving Effectiveness of Safety Training at Construction Worksite Using 3D BIM Simulation

Table 2

t-test result of pretest and posttest of each group.

PretestPosttest
ConventionalAlternativeSig.ConventionalAlternativeSig.

Total19.0420.74NS48.1458.290.00
Identification10.989.97NS28.8231.140.00
Prevention8.0610.77NS19.3227.150.00

Note. NS = not significant.