Observed Ground Pressure Acting on the Lining of a Large-Diameter Shield Tunnel in Sandy Stratum under High Water Pressure
Table 3
Observed total earth pressure acting on the lining on the crown and the theoretical calculations.
| Section | Section-a (ring 479) | Section-b (ring 1094) | Section-c (ring 1210) | Section-d (ring 1384) |
| Overburden soil depth over tunnel outer diameter | 3.04 | 1.34 | 1.15 | 1.11 | Calculated by full total overburden ground pressure (kPa) | 632.53 | 561.81 | 494.06 | 414.53 | Terzaghi’s reduced pressure plus hydrostatic pressure (kPa) | 457.35 | 511.54 | 450.66 | 372.13 | Observed vertical total earth pressure (kPa) | 548.92 | 465.73 | 396.94 | 323.84 | Observed vertical total earth pressure over full overburden ground pressure | 0.87 | 0.83 | 0.80 | 0.78 | Observed vertical total earth pressure over calculated Terzaghi’s reduced pressure plus hydrostatic pressure | 1.20 | 0.91 | 0.88 | 0.87 | Observed vertical total earth pressure over theoretical hydrostatic | 1.79 | 1.10 | 1.06 | 1.09 |
|
|