Primary Investigation on Equivalent Anchoring Method of Jointed Rock Mass Tunnel and Its Engineering Application

Table 4

Equivalent simulation results by improving the friction angle of surrounding rock mass.

Improved parameterDisplacement of lining (mm)
Vertical displacement of domeHorizontal displacement of arch foot

With bolts installed17.165.02
Without bolts installed19.147.76
1.117.095.96
1.216.735.22
1.316.424.80
1.416.194.68
1.516.034.56
1.616.004.50
1.716.084.64
1.816.184.70
1.916.284.80
2.016.284.82