Research Article
Engineering Classification of Jointed Rock Mass Based on Connectional Expectation: A Case Study for Songta Dam Site, China
Table 3
Evaluation indexes of rock mass in each adit are expressed by the interval number.
| Evaluating index | Interval number | PDS1 | PD222 | PD224 | PD226 | Section 1 | Section 2 | Section 3 | Section 1 | Section 2 | Section 3 | Section 1 | Section 2 | Section 3 | Section 1 | Section 2 | Section 3 |
| Rock strength (MPa) | Minimum | 47.4 | 25.7 | 73.9 | 34.8 | 67.3 | 51.3 | 62.6 | 60.2 | 87.8 | 49.3 | 129.9 | 117.0 | Maximum | 163.6 | 241.5 | 138.9 | 83.0 | 131.6 | 99.4 | 145.3 | 189.1 | 192.0 | 130.1 | 234.1 | 239.7 | Expectation | 102.2 | 96.8 | 106.0 | 56.9 | 116.1 | 94.0 | 114.4 | 111.9 | 148.1 | 85.0 | 171.0 | 195.7 |
| Joint spacing (m) | Minimum | 0.007 | 0.006 | 1.311 | 0.003 | 0.003 | 0.112 | 0.020 | 0.033 | 0.277 | 0.044 | 0.032 | 4.153 | Maximum | 4.573 | 7.349 | 7.311 | 8.016 | 5.233 | 18.781 | 11.155 | 7.524 | 33.844 | 4.699 | 8.838 | 8.333 | Expectation | 0.802 | 1.164 | 4.046 | 0.791 | 0.999 | 4.294 | 0.981 | 0.875 | 7.097 | 0.846 | 2.006 | 6.481 |
| RQD (%) | Minimum | 54 | 35 | 94 | 14 | 78 | 72 | 54 | 45 | 92 | 34.3 | 86.8 | 81.8 | Maximum | 85 | 100 | 100 | 98 | 98 | 100 | 98 | 100 | 100 | 97.0 | 100.0 | 100.0 | Expectation | 74 | 84 | 98 | 68 | 91 | 96 | 74 | 92 | 98 | 66 | 96 | 98 |
| Roughness | Minimum | 1 | 1 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | 4 | Maximum | 9 | 7 | 7 | 8 | 8 | 9 | 8 | 9 | 9 | 7 | 8 | 5 | Expectation | 5.70 | 4.89 | 4.67 | 5.49 | 5.18 | 5.25 | 6.32 | 6.78 | 4.54 | 4.57 | 4.79 | 4.06 |
| Aperture | Minimum | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | Maximum | 6 | 6 | 3 | 6 | 4 | 3 | 6 | 5 | 5 | 6 | 4 | 5 | Expectation | 2.43 | 1.79 | 1.33 | 1.83 | 1.42 | 1.15 | 2.00 | 2.01 | 1.73 | 2.07 | 1.14 | 1.63 |
| Weathering | Minimum | 2 | 2 | 1 | 2 | 2 | 1 | 1 | 1 | 1 | 2 | 1 | 1 | Maximum | 4 | 4 | 4 | 4 | 3 | 2 | 4 | 4 | 3 | 4 | 2 | 2 | Expectation | 2.46 | 2.67 | 1.94 | 2.51 | 2.18 | 1.97 | 2.96 | 1.72 | 1.77 | 2.85 | 1.92 | 1.94 |
| Groundwater | Minimum | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | Maximum | 4 | 4 | 4 | 3 | 2 | 4 | 5 | 5 | 2 | 4 | 4 | 4 | Expectation | 1.58 | 1.92 | 1.72 | 1.49 | 1.25 | 1.13 | 1.92 | 2.07 | 1.50 | 1.28 | 1.71 | 2.13 |
| Dip difference (°) | Minimum | −44 | −45 | −23 | −44 | −27 | −39 | −32 | −42 | −34 | −36 | −30 | −12 | Maximum | 6 | 17 | 10 | 19 | 15 | 6 | 11 | 33 | −5 | 14 | 16 | 25 | Expectation | −33.31 | −19.94 | −2.50 | −11.70 | −6.90 | −12.47 | −16.16 | −9.36 | −24.62 | −16.10 | −5.88 | 8.20 |
|
|