Research Article

Quantitative Definition of Seismic Performance Levels for Precast Bridge Piers with Continuous Reinforcement

Table 7

M-Phi analysis result based on the proposed seismic evaluation criteria.

M-Phi
ā€‰Concrete crackingReinforcement yieldingTendon yieldingCover concrete spallingReinforcement fractureTendon fracture
Displacement (mm)Load (kN)Displacement (mm)Load (kN)Displacement (mm)Load (kN)Drift (%)Displacement (mm)Load (kN)Displacement (mm)Load (kN)Displacement (mm)Load (kN)

T50PT1A1.0153.422.739012.42801.2333.8421395.8441217517
T75PT1A0.8665.222.242112.13111.2835.3459388.2455216542
T75PT2A0.3526.822.742527.74651.2835.3506393.3422227609
T75PT3A0.5842.822.742922.74291.2634.5484393.3432227582